Knitting progress
Tuesday, 9. March 2010 7:51
The problem with jumping from project to project is that I don’t have very much in the way of interesting progress to show. I still haven’t forgotten about the 12 sweaters in a year project–although I’m a wee bit behind, technically, I only have to finish the sweaters this year. With that in mind, I hauled Sizzle out of my UFO pile.
I had a few inches left on the front, which were finished quickly, then I settled down to seam it up during the Oscars. On the principle that doing two things that always seem to take forever at once would somehow speed them both up? (Also, can we take a minute here and talk about the Oscars? There were a few great looks–Sandra Bullock, Cameron Diaz, Sandy Powell–and Meryl Streep and Helen Mirren are my role models on how to age gracefully, but what was up with the fooferah on all the skirts? It’s a dress, not sculptural art. Also, Zoe Saldana? I love you, I do, but didn’t anyone tell you that Ursula from the Little Mermaid was attacking that dress? Seriously. Take it off.)
Ahem.
I also picked up and worked the neck. It’s not overlapping quite as much as I’d thought, but is still cute. And dangerously low-cut, so that could be interesting.
And I’m still plugging along on the Atlantis sock. The problem with this is that the chart is just long enough that I can’t memorize it, or easily tell where I left off, so I can only wor on it when I have a little over an hour free, which isn’t always workable. I’m getting there, though!
Category:Knitting Projects, Socks, Sweaters, knitting | View Comments | Autor: Ivy




